Traqo.ai
By Outcome

Run a Lean Yard

No more 4-hour gate waits. Drivers get a slot, a dock, a QR code. In and out.

0 paper gate-passes at customer sites · 85% drop in dwell time

Yard · Plant-2
24 trucks today
Gate-in
QR scan · 30 sec
Bay assigned
Bay 4 · loading
Gate-out
Auto exit pass
−85%
gate-to-dock
0
paper passes
+22%
yard throughput
Slot · QR · exit
In and out

What's broken today

The cost of the status quo.

Pain 01

30 trucks queued at the gate, all arriving at 9am.

Pain 02

Security guard with a paper register and a walkie-talkie.

Pain 03

Loading bay supervisor running around with a clipboard.

How it works

Three steps. From your first day.

Yard ops · Vapi plant · today
42 min
avg dock time · ↓ from 96 min
94%
slot adherence · pre-booked
28 sec
QR + weighbridge gate-in
12 of 16 docks active · 0 overlaps
1
Step 01

Slot booked in advance

Driver/transporter books a dock window before leaving the warehouse.

2
Step 02

Gate-in in 30 seconds

QR scan + weighbridge + photo capture, no paper.

3
Step 03

Dock-to-gate-out clean

Bay assigned, loading tracked, exit pass auto-generated.

Outcomes that show up in your P&L

What customers actually see.

Result 01

−85%

gate-to-dock time

Result 02

0

paper gate-passes

Result 03

+22%

yard throughput

"Fully digitised in-plant. Zero paper gate-passes. Our drivers love us now."

Orientbell Tiles
Plant Operations

The result

0 paper gate-passes

Get started

Built for Run a Lean Yard.
Ready in 30 minutes.

We'll walk through your own routes, lanes, and PODs. No IT team. No commitment.

Run a Lean Yard · Gate-to-dock in minutes, not hours · Traqo.ai