How Orientbell digitized 49,000 freight invoices
Orientbell Tiles replaced two systems and four spreadsheets with one live view from plant gate to port — retiring three systems, lifting on-time dispatch to 92%, and cutting demurrage cost 38%.
Orientbell Tiles digitized more than 49,000 freight invoices by consolidating plant dispatch and EXIM containers onto Traqo — replacing two systems and four spreadsheets with one live view from plant gate to port. Real-time visibility across indent, tracking and an AI control tower lifted on-time dispatch to 92% and cut demurrage cost by 38%.
Traqo runs freight for more than 100 enterprises across a dozen countries, and the patterns repeat regardless of geography: the freight itself is rarely the problem — the paperwork and the disconnected systems around it are. Orientbell Tiles, a building-materials manufacturer, is a clean example of that pattern and of what changes when a shipper puts plant dispatch and EXIM containers on one platform instead of two systems and four spreadsheets. The headline number is that Orientbell has digitized more than 49,000 freight invoices on Traqo. This is the story of how a dispatch-to-document workflow produced that number as a by-product.
The problem: one truth, scattered across four spreadsheets
Like most multi-plant manufacturers, Orientbell's freight lived in fragments. Plant dispatch ran in one system; EXIM containers moving to port ran in another; and the reconciliation between them — gate passes, trip status, invoices — lived in a handful of spreadsheets that different teams updated on their own schedules. The predictable result was a weekly ritual: plant teams emailing PDFs to finance every Friday so someone could stitch a picture together after the fact. By the time the numbers were reconciled, the freight had already moved and any chance to prevent a demurrage charge or a missed slot was gone.
For a building-materials shipper, that lag is expensive. Tiles are heavy, low-margin and volume-driven; demurrage on containers waiting at port and delays on plant dispatch eat directly into margin. The company did not need more dashboards — it needed one source of truth that updated in real time instead of every Friday.
The solution: dispatch, tracking and a control tower on one platform
Orientbell consolidated onto Traqo across three connected modules. Indent and dispatch automation replaced the manual plant-gate process, so every dispatch and gate pass was created and recorded digitally rather than on paper. Real-time tracking gave the central team live position on trucks and containers from plant gate to port, without depending on every carrier owning a GPS device. And the AI control tower pulled it all into one screen, surfacing the exceptions worth acting on — a container idling too long, a dispatch slipping — while there was still time to act.
Because the modules share one data model, the workflow became continuous instead of episodic. A dispatch created an indent; the indent produced a gate pass; the trip was tracked live; and the resulting document and invoice were captured against the same trip record. Nothing had to be re-keyed between systems, and finance stopped waiting for Friday's PDFs because the truth was already in the platform.
Why 49,000 digitized invoices is the number that matters
Invoice digitization sounds like a back-office metric, but for a shipper it is the clearest proof that the whole chain is connected. An invoice can only be digitized cleanly if the dispatch, the gate pass, the trip and the delivery that sit behind it are all already digital and already reconciled against each other. Reaching 49,000-plus digitized freight invoices means the plant-to-port workflow held together at scale — 2,500-plus dispatches a month, 30,000-plus gate passes — with each document tracing back to a single trip record rather than a spreadsheet cell someone typed by hand.
That connectedness is what turned into money. With dispatch and container movement visible in real time, Orientbell lifted on-time dispatch to 92% and cut demurrage cost by 38% — the direct payoff of seeing a container about to incur charges in time to do something about it. Three of the four original systems were retired, collapsing a four-way reconciliation into one live view.
"Our central tower finally has the truth in real time. Plant teams stopped sending PDFs to finance every Friday."
From gate pass to reconciled invoice: how the number adds up
It helps to walk the workflow the way a single consignment does, because that is where 49,000 digitized invoices actually come from. A dispatch is raised as a digital indent rather than a paper slip at the plant gate. That indent generates a digital gate pass — one of the 30,000-plus Orientbell has issued — so the vehicle leaves with its trip already recorded, not written into a register to be typed up later. From there the trip is tracked live, plant gate to port, so the central team can see a container that is drifting toward demurrage while there is still time to reroute or expedite it.
When the goods are delivered, the proof of delivery is captured and matched to the same trip, and the freight invoice is reconciled against that record in settlement rather than in a spreadsheet. Because every step wrote to one record, the invoice at the end is already digital and already matched — there is nothing to re-key and nothing to chase. Multiply that clean chain across 2,500-plus dispatches a month and the 49,000 digitized invoices are simply what the workflow leaves behind. The number is large because the process is connected, not because anyone ran a data-entry project.
The rollout: one workflow at a time
A consolidation like this can sound like a big-bang transformation, but the practical version is the opposite. Because the platform is modular and needs no GPS hardware to roll out, Orientbell could sequence what went live first — put the plant-gate and dispatch workflow on the platform, then layer in real-time tracking across the network, then switch on the control-tower view once there was enough live data to make the exceptions meaningful. Each module delivered value on its own, so the business case never depended on finishing everything before anything worked.
That sequencing matters for any manufacturer weighing a change. You do not have to rip out four systems on day one; you replace the workflow that hurts most first — for Orientbell, the Friday PDF ritual between plant teams and finance — and expand from there. The absence of hardware is what keeps the timeline short: there is no device procurement, no installation across a mixed and partly hired fleet, and no waiting on a rollout truck to visit every plant before you can see anything.
What other manufacturers can take from it
Orientbell's story is not really about tiles or about India — it is about what happens when a manufacturer stops treating dispatch, tracking, documents and settlement as four separate problems. Three lessons travel to any multi-plant shipper. First, the win is reconciliation, not another dashboard: the value came from one data model where a dispatch, a gate pass, a trip and an invoice describe the same event. Second, real-time beats weekly: preventing a demurrage charge requires seeing the container now, not on Friday. Third, digitized documents are a symptom of a healthy chain, not a project of their own — you do not set out to digitize 49,000 invoices; you connect the workflow and the invoices digitize themselves.
The full profile — modules, KPIs and quote — lives on the Orientbell customer story, alongside other manufacturers who consolidated freight onto one platform.
- 1Orientbell Tiles replaced two systems and four spreadsheets with one live view from plant gate to port on Traqo.
- 2Consolidating indent/dispatch, real-time tracking and an AI control tower digitized 49,000+ freight invoices, 30,000+ gate passes and 2,500+ monthly dispatches.
- 3Real-time visibility lifted on-time dispatch to 92% and cut demurrage cost by 38%; three of four systems were retired.
- 4Digitized invoices are proof the whole chain is connected — dispatch, gate pass, trip and document all trace to one record.
- 5The transferable lesson for any multi-plant manufacturer: the value is reconciliation on one data model, not another standalone dashboard.
Frequently asked questions
- How did Orientbell digitize 49,000 freight invoices?
- Orientbell consolidated plant dispatch and EXIM containers onto Traqo across indent/dispatch automation, real-time tracking and an AI control tower on one data model. Because each dispatch, gate pass, trip and document traces to a single trip record, invoices digitize cleanly as a by-product of the connected workflow — more than 49,000 of them to date.
- What results did Orientbell get with Traqo?
- Orientbell replaced two systems and four spreadsheets with one live view from plant gate to port: three of four systems retired, on-time dispatch lifted to 92%, demurrage cost cut by 38%, and 49,000+ invoices, 30,000+ gate passes and 2,500+ monthly dispatches managed on one platform.
- Which Traqo modules did Orientbell use?
- Orientbell runs indent and dispatch automation to replace the manual plant-gate process, real-time tracking for live visibility from plant gate to port without depending on GPS hardware, and the AI control tower to surface the exceptions worth acting on — all on one shared data model.
- What industry is Orientbell in?
- Orientbell Tiles is a building-materials manufacturer. Tiles are heavy, low-margin and volume-driven, so delays on plant dispatch and demurrage on containers waiting at port eat directly into margin — which is why real-time visibility across dispatch and EXIM movement produced such a direct payoff.
- Can other manufacturers replicate Orientbell's results?
- The transferable lesson applies to any multi-plant shipper: the value comes from reconciliation on one data model — where a dispatch, gate pass, trip and invoice describe the same event — not from adding another standalone dashboard. Real-time visibility, not weekly PDFs, is what prevents demurrage and missed slots.
Writes about how the world's largest shippers actually run freight — the real workflows, the stuff vendors don't put in slides.
More from the team
After 14 customer interviews, every transporter chose WhatsApp over a slick web portal. Here's the data — and what it taught us about adoption in emerging-market logistics.
Our OCR pipeline turns smudged, curled, sometimes wet paper PODs into structured JSON in 30 seconds. Here's the architecture — and the failure modes nobody warns you about.
Most TMS dashboards drown ops teams in red. We rebuilt the control tower around the five decisions a dispatcher actually makes before lunch.
_1777711377206.png)